Skip to main content Skip to site footer
Club News

All change at Latics

23 May 2013

Club News

All change at Latics

23 May 2013

Construction of new match control room, television gantry under way

The construction of a new match control room and television gantry is well under way at Boundary Park as the photograph shows.

The new two-tiered structure will be positioned between The Verlin Stand and Main Stand.

Both had previously been on the Broadway Stand and are having to be demolished for the construction of the new North Stand.

The match control room will occupy the first floor of the new building with the television gantry positioned above it.



Advertisement block

iFollow Next Match Tickets Account